Mirani Solar Farm
Project Capacity
60MW
Project Cost
$110 million
Project Area
173 hectares
Technology
Horizontal Tracking
Local Government Area
Mackay Regional Council
Grid Connection
Mirani Substation

The Mirani Solar Farm is a utility scale renewable energy project with an output measuring up to 60 megawatts (MW) that will generate clean and renewable electricity from the power of the sun.

The $110-million-dollar project is located between the townships of Mirani and Gargett in the Mackay Regional Council. The site is currently used for horticultural purposes. The project site was chosen as it has proximity to the Ergon Energy network, access from major highways and relatively flat land.

The solar farm will cover an area of approximately 173 hectares (428 acres) and comprise approximately 180,000 solar photovoltaic modules, known more commonly as ‘PV Modules’ or ‘solar panels’. The solar panels are identical in type but larger in size to those used in residential solar installations located on homes throughout Australia.

The solar panels will be installed on ground-mounted frames that will slowly track the daily horizontal movement of the sun. The solar panels will generate direct current (‘DC’) electricity that will be inverted to alternating current (‘AC’) via containerized power conversion units. The power conversion units located within the site will feed AC electricity into an onsite power reticulation system before the power is centrally collected and dispatched to the local electricity distribution network via the Ergon transmission network.